CSWPPP Requirements for Texas Projects: What the State Doesn’t Tell You Upfront

Construction site in Texas with erosion control measures in place to meet CSWPPP requirements

If you’re planning a construction project and keep hearing about CSWPPP requirements, but aren’t quite sure what they are — don’t worry, you’re not alone. A lot of developers, contractors, and project managers know they need “something for stormwater,” but when it comes to the details, things get murky.

As environmental consultants with over 30 years of experience helping clients across Texas, we’ve seen it all — from perfectly executed CSWPPPs to job sites shut down over avoidable mistakes. This guide breaks down what CSWPPP requirements actually are, who needs to follow them, what a compliant plan must include, and what people often get wrong.

What Are CSWPPP Requirements and Why Do They Matter?

A CSWPPP, or Construction Stormwater Pollution Prevention Plan, refers to a set of CSWPPP requirements that apply to most construction activities disturbing an acre or more of land. The goal of these requirements is to prevent sediment, chemicals, and other pollutants from washing off your construction site and into nearby waterways during a rainstorm.

In other words, it’s not just paperwork. It’s a legal requirement tied to the Clean Water Act — and if a CSWPPP is missing or incomplete, you could face fines, delays, or even stop-work orders.

Quick Real-World Example

One of our clients, a first-time developer, called us after receiving a surprise visit from a city inspector. They’d started grading their site without a CSWPPP in place — assuming they’d “get to it later.” That oversight cost them a $5,000 fine and a two-week delay while we scrambled to pull everything together. Lesson learned: it’s way cheaper to plan ahead.

Do I Even Need to Meet CSWPPP Requirements?

If your project will disturb one acre or more of land — or it’s part of a larger development plan — then yes, you need to follow CSWPPP requirements.

This applies to:

  • New commercial or residential builds

  • Roadway construction

  • Utility or pipeline installation

  • Large landscaping projects

Even smaller sites might still fall under local MS4 (Municipal Separate Storm Sewer System) regulations, so it’s always smart to check.

What Are the Basic CSWPPP Requirements?

At its core, CSWPPP requirements include the following components:

  • A detailed site map showing grading, drainage, and stormwater flow

  • A description of construction activities and their pollution potential

  • A list of Best Management Practices (BMPs) to control erosion and runoff

  • A schedule for inspections and maintenance

  • A spill prevention and response plan

  • Names of responsible personnel and documentation of training

Think of it as your site’s playbook for staying clean and compliant during construction.

Common CSWPPP Requirements That Construction Sites Miss

We’ve reviewed and revised hundreds of CSWPPPs, and most of the issues fall into the same handful of mistakes:

1. BMPs That Don’t Match the Site

Throwing down a few silt fences won’t cut it. BMPs (Best Management Practices)  need to be tailored to your specific slope, soil type, and drainage patterns. Otherwise, you might be controlling runoff in the wrong direction — or not at all.

2. Forgetting to Update the CSWPPP

If your site layout changes (and it almost always does), your CSWPPP needs to reflect those changes. Many people create a plan and then forget it exists, which is a big red flag during an inspection.

3. Skipping Inspections

Most projects require routine inspections, especially after major rain events. Missing even one can put you out of compliance.

4. Not Training Your Crew

Everyone on-site needs to understand the basics of the CSWPPP — not just the project manager. We’ve seen crews accidentally remove BMPs because “they were in the way.”

5. Not Posting Your NOI and CSWPPP Onsite

Your Notice of Intent (NOI) and a copy of the CSWPPP must be available onsite and easily accessible. This is one of the first things inspectors look for.

Why Work with a Consultant for CSWPPP Requirements?

If you’re reading this and feeling overwhelmed — that’s totally normal. Most contractors and property owners don’t have time to study stormwater regulations on top of managing a construction project. That’s where we come in.

As professional environmental consultants, we help clients:

  • Determine if a CSWPPP is required

  • Design a compliant, customized plan

  • File the necessary forms (NOI, NOT)

  • Conduct regular inspections and keep records

  • Stay ahead of regulatory changes

We’re not just checking boxes — we’re helping your project stay on track, on budget, and out of trouble.

How Our CSWPPP Process Works

We’ve refined our process to keep things simple and efficient:

 1. Site Evaluation

We walk the site (or review plans), assess potential risks, and determine what’s required under local, state, or federal rules.

2. Plan Development

We build a custom CSWPPP that meets all CSWPPP requirements, including maps, BMPs, and inspection schedules.

3. Filing and Setup

We handle the NOI filing and provide onsite documentation — including signage, logs, and anything your inspector will want to see.

4. Inspections and Maintenance

We can conduct weekly or rain-triggered inspections and update the plan as your site evolves.

Your Next Step: Stay Ahead of CSWPPP Requirements

It’s easy to put stormwater compliance on the back burner, especially in the early stages of a project. But trust us — a little planning now will save you a lot of stress (and money) later.

If you’re not sure whether you meet CSWPPP requirements — or you need a plan created fast — we can help. We’ve worked on hundreds of sites across Texas and know how to keep your project compliant from start to finish. Contact us today and let’s get your project started the right way!